While I haven’t posted much lately, work has been continuing slowly in and around work and personal commitments. I’m pleased to say that I finished configuration and checkout of the final control point tonight at South Chitina. CTC now works over the entire length of the mainline. (The actual trackside signals will be installed once base scenery is done – for now it’s just the fascia signal repeaters.) Most of the rest of the electrical is also complete. The only thing really remaining is to create and wire control panels for the various yards. Then it’s on to starting scenery.
Signals are Done!
Leave a reply